Mariastichting Haarlem
The parking garage is available to both residents and visitors due to renovations.
08 May 2014
180 of the 550 spaces will be made available. Residents are accommodated in two compartments, one parking and one in-parking functionality, with drive-through time adjustable.
In the garage there is first a public area for short-term parking on level -1 and further to the back a compartmentalization is applied by means of barriers. Level -2 is entirely for residents and at the top of the slope on level-1 there is a barrier installation for closing off and providing access to level -2.
The project consists of the following IP products:
- Entry station, with Mifare reader for residents (IP In)
- Exit station (IP Out)
- Barriers (IP 350)
- 'Full' signaling
- Access station (IP Controller)
- Access station, especially for subscribers (residents)
- IP Door, for parking facility access